











































Resources
DQM and ODESS Documents and Training
Specifications, policy memoranda, guidance, research, presentations and training material for Dredging Quality Management (DQM) and the Operations and Dredging Endangered Species System (ODESS).
-
September 18, 2026
Download (238 KB)Hopper Dredge Plant Instrumentation Plan Punch-List
-
September 18, 2026
Download (232 KB)Mechanical Dredge Plant Instrumentation Plan Punch-List
-
September 18, 2026
Download (239 KB)Pipeline Dredge Plant Instrumentation Plan Punch-List
-
September 18, 2026
Download (334 KB)Scow Dredge Plant Instrumentation Plan Punch-List
-
September 8, 2026
Download (50 KB)The consolidated DQM specification in SpecsIntact format.
-
September 8, 2026
Download (70 KB)The consolidated DQM specification in PDF format.
-
September 8, 2026
Download (43 KB)The consolidated DQM specification in Microsoft Word.
-
July 10, 2026
Download (26.3 MB) -
March 24, 2026
Download (176 KB)A guide to the onsite quality assurance checks for scows, hoppers, pipeline and mechanical dredges: what each check demonstrates and how it is performed. For scows and pipelines the required checks depend on the assigned profile; all checks apply to hoppers and mechanical dredges.
DQM 101 Training
MP4March 15, 2026
Download (242.5 MB)-
March 2, 2026
Download (124.6 MB) -
January 10, 2026
Download (27.8 MB) -
December 19, 2025
Download (93 KB)USACE Headquarters directs mandatory implementation of the National DQM Program for all in-house and contracted dredging — every dredge and scow type, including mechanical, agitation and water-injection, and small dredges, with no exceptions.
-
April 21, 2025
Download (174 KB)Who does what, and when, on a Civil Works dredging project — from putting the specification in the contract package through project setup, certification verification, dredging and closeout. Each step is split between the district point of contact, the DQM Center and the contractor.
-
February 19, 2025
Download (161 KB)Who does what, and when, on dredging under a Department of the Army permit — from the pre-application meeting and permit evaluation through project setup, certification verification and dredging. Each step is split between the district point of contact, the DQM Center and the permittee.
-
June 4, 2024
Download (63.2 MB) -
February 6, 2024
Download (2.8 MB)The form that tells the DQM Center a new project is coming: district, contract or permit number, contractor, the plants expected to work, and the dredging and placement areas. Submit it before work starts.
-
November 12, 2019
Download (171 KB)Makes DQM monitoring mandatory, effective immediately, on all future unrestricted (Full and Open Competition) pipeline dredging contracts. All contractors, including small businesses, must meet the DQM pipeline specifications when bidding on unrestricted contracts; restricted contracts remain exempt.
-
April 22, 2014
Download (110 KB)After several years of DQM on hoppers and scows, HQUSACE directs a phased expansion to pipeline dredges — beginning in July 2014 with government-owned plant and extending to industry contracts in 2015.
-
October 2, 2006
Download (516 KB)Implementation guidance issued under the April 2006 directive: it stands up the national support team at the Mobile District and sets out system capabilities, dredge certification, district points of contact, training, and the always-on monitoring model for hopper and scow dredges.
-
April 17, 2006
Download (971 KB)The original directive. The USACE Director of Civil Works mandates Corps-wide automated dredging quality assurance monitoring using the Silent Inspector system, the program DQM grew out of, effective immediately on all hopper and scow dredging contracts.
- Download (108 KB)
Establishes DQM as the automated monitoring technology for dredging under Department of the Army permits, rescinding and replacing RGL 08-01. If a permitted project is constructed with a dredge, DQM is generally required unless the District Engineer documents a justified exemption.
- Open website
Endangered Species Act of 1973 (opens in a new tab)
fisheries.noaa.gov
HopperString
XMLDownload (2 KB)Example hopper dredge data-transmission string.
MechanicalString
JSONDownload (376 B)Example mechanical dredge data-transmission string.
- Download (793 KB)
- Open website
National Marine Fisheries Service (NMFS) (opens in a new tab)
fisheries.noaa.gov
- Open website
North Atlantic Right Whale Identification Guide (opens in a new tab)
fisheries.noaa.gov
- Download (1.9 MB)
- Download (80 KB)
PipelineString
JSONDownload (337 B)Example pipeline dredge data-transmission string.
- Open website
Protected Species Observer Information (opens in a new tab)
greateratlantic.fisheries.noaa.gov
- Download (779 KB)
- Download (34 KB)
ScowString
XMLDownload (871 B)Example scow data-transmission string.
- Download (1.8 MB)
- Open resource
Southeast Fisheries Science Center Sea Turtle Research Techniques Manual (opens in a new tab)
repository.library.noaa.gov
- Open website
State Coordinators for the Sea Turtle Stranding and Salvage Network (opens in a new tab)
fisheries.noaa.gov
- Open website
- Open website
US Fish & Wildlife Service Atlantic Sturgeon Cooperative Tagging Program (opens in a new tab)
fws.gov