Resources
Everything the Program Publishes, in One Place
The specifications, memoranda, guidance, research and training material that support Dredging Quality Management, gathered from across this site. Each item is served from this domain and always resolves to the current version — a link you save today keeps working when the document is next revised.
-
September 18, 2026
Download (238 KB)Hopper Dredge Plant Instrumentation Plan Punch-List
-
September 18, 2026
Download (232 KB)Mechanical Dredge Plant Instrumentation Plan Punch-List
-
September 18, 2026
Download (239 KB)Pipeline Dredge Plant Instrumentation Plan Punch-List
-
September 18, 2026
Download (334 KB)Scow Dredge Plant Instrumentation Plan Punch-List
-
September 8, 2026
Download (70 KB)The consolidated DQM specification in PDF format.
-
September 8, 2026
Download (50 KB)The consolidated DQM specification in SpecsIntact format.
-
September 8, 2026
Download (43 KB)The consolidated DQM specification in Microsoft Word.
-
March 24, 2026
Download (176 KB)A guide to the onsite quality assurance checks for scows, hoppers, pipeline and mechanical dredges: what each check demonstrates and how it is performed. For scows and pipelines the required checks depend on the assigned profile; all checks apply to hoppers and mechanical dredges.
DQM 101 Training
MP4March 15, 2026
Download (242.5 MB)-
March 2, 2026
Download (124.6 MB) -
December 19, 2025
Download (93 KB)USACE Headquarters directs mandatory implementation of the National DQM Program for all in-house and contracted dredging — every dredge and scow type, including mechanical, agitation and water-injection, and small dredges, with no exceptions.
-
April 21, 2025
Download (174 KB)Who does what, and when, on a Civil Works dredging project — from putting the specification in the contract package through project setup, certification verification, dredging and closeout. Each step is split between the district point of contact, the DQM Center and the contractor.
-
February 19, 2025
Download (161 KB)Who does what, and when, on dredging under a Department of the Army permit — from the pre-application meeting and permit evaluation through project setup, certification verification and dredging. Each step is split between the district point of contact, the DQM Center and the permittee.
-
June 4, 2024
Download (63.2 MB) -
February 6, 2024
Download (2.8 MB)The form that tells the DQM Center a new project is coming: district, contract or permit number, contractor, the plants expected to work, and the dredging and placement areas. Submit it before work starts.
-
November 12, 2019
Download (171 KB)Makes DQM monitoring mandatory, effective immediately, on all future unrestricted (Full and Open Competition) pipeline dredging contracts. All contractors, including small businesses, must meet the DQM pipeline specifications when bidding on unrestricted contracts; restricted contracts remain exempt.
-
April 22, 2014
Download (110 KB)After several years of DQM on hoppers and scows, HQUSACE directs a phased expansion to pipeline dredges — beginning in July 2014 with government-owned plant and extending to industry contracts in 2015.
-
October 2, 2006
Download (516 KB)Implementation guidance issued under the April 2006 directive: it stands up the national support team at the Mobile District and sets out system capabilities, dredge certification, district points of contact, training, and the always-on monitoring model for hopper and scow dredges.
-
April 17, 2006
Download (971 KB)The original directive. The USACE Director of Civil Works mandates Corps-wide automated dredging quality assurance monitoring using the Silent Inspector system, the program DQM grew out of, effective immediately on all hopper and scow dredging contracts.
- Download (108 KB)
Establishes DQM as the automated monitoring technology for dredging under Department of the Army permits, rescinding and replacing RGL 08-01. If a permitted project is constructed with a dredge, DQM is generally required unless the District Engineer documents a justified exemption.
HopperString
XMLDownload (2 KB)Example hopper dredge data-transmission string.
MechanicalString
JSONDownload (376 B)Example mechanical dredge data-transmission string.
PipelineString
JSONDownload (337 B)Example pipeline dredge data-transmission string.
ScowString
XMLDownload (871 B)Example scow data-transmission string.