AdeleAlaskaAlaskan EagleAlaskan HawkAllison CrosbyAmelia IslandAmericaAMR A3Andi RaeApacheArrow PointArthur JArulaqAtchafalayaAtlanticAvalonBaltimoreBayportBeaverB.E. LindholmBen WestonBill HolmanBlack HawkBorinquenBR 8Brandy StationBrittyn BBrunswickBuxton IICaptain FrankCarolinaCatalinaCharlestonChesapeakeCK 7ClearwaterCMT 193CMT 249CMT 278-BCMT 296-BCod Fish IIColumbiaCommanderConstellationCrew CompassC.R. McCaskillCrosby DredgerCrowCrown PointCT 150

Five Year Dredging Schedule

Dredging work USACE districts have planned for the current federal fiscal year and the four that follow, with the dates, quantities and locations recorded for each job. Plans in the out-years are estimates and change as budgets and conditions do.

A job appears here when it is programmed for one of those years, or when its solicitation, award, construction or equipment dates fall in them. The fiscal year shown against it is the year the work was programmed, which for longer jobs is earlier than the year it is worked in.

1,177 jobs

Job Type
|
2022Norfolk Norfolk Harbor 55ft Deepening Project ContractedCompletedMay 6, 2022Jun 28, 2022Sep 29, 2025Cutter Suction6,808,600Norfolk Harbor Craney IslandConfined (Diked) Placement AreaDisposalContractedW9123622B5000 https://sam.gov/opp/9d2995babeaa4363af19d1ae6b29cff8/view22NAO002Sep 20, 2026
2022St. Paul FY22 Pierce County Islands - Wi - Sec 1122 ContractedCompletedMay 1, 2023Misc22MVP002Sep 15, 2026
2022St. Paul FY22 Pigs Eye Cap 204 ContractedCompletedMay 1, 2022Nov 15, 2025Misc300,000DA 22MVP0032-823.8-LMT - Pine Bend22MVP003Sep 20, 2026
2023Chicago FY23 Big Suamico River, Wi Dredging Fy24 Iija/Bil, Fy26 To Be Awarded ContractedAdvertisedMaintenanceJun 25, 2026Jun 26, 2026Sep 1, 2026Nov 25, 2026Misc25,000BIG SUAMICO RIVERLong Tail PointBeach/ShorelineW912P625B0020 https://sam.gov/opp/c03094cb30f5417ba101ca938dbe18ec/view23LRC008Sep 20, 2026
2023Detroit FY23 Portage Lake Harbor ContractedCompletedMaintenanceJan 6, 2025Jan 22, 2025Aug 25, 2025Pipeline35,000Portage Lake HarborPortage Lake HarborBeach/ShorelineContractedW911XK24R0019 23LRE019Sep 15, 2026
2023Galveston Freeport Harbor Channel Improvement Project - Reaches 1, 2 & 4 ContractedCompletedFeb 17, 2023Apr 3, 2023Clamshell, HopperFreeport HarborFreeport Harbor New Work ODMDS, PA 1Open Water, Open WaterDisposalContractedW912HY23B0001 https://sam.gov/opp/40b377d6bab344c8aad01b62e89048d6/view23SWG015Sep 15, 2026
2023Jacksonville FY23 Brevard County Shore Protection Project - Mid & South Reaches ContractedCompletedMiningHopperCanaveral Shoals II - Area A, Canaveral Shoals II - Area B, Canaveral Shoals II - Area D, Canaveral Shoals II - Area E, Canaveral Shoals II - Area CSR-NSRDA, Brevard County South SPP, Brevard County Midreach SPPBeach/Shoreline, Beach/Shoreline, Beach/ShorelineTask OrderW912EP18R0029 https://sam.gov/opp/31ce601d8701be7fabc6090419deb408/view23SAJ024Sep 15, 2026
2023Mobile FY24 Mobile Harbor Maintenance Dredging (Hopper) ContractedCompletedMaintenanceMar 1, 2024Apr 17, 2024HopperMobile Lower Bay Channel, Mobile Bar Channel, Mobile River Channel, Mobile Upper Bay ChannelMobile ODMDS, SIBUA Northwest ExtensionOpen Water, Open WaterBeach/Shoreline Nourishment, DisposalContractedW9127823B0001 https://sam.gov/opp/daf4f0e06e214adab1b80211ea86d1f9/view23SAM024Sep 15, 2026
2023New Orleans FY23 Atchafalaya Bar Channel Agitation Dredging ContractedActiveMaintenanceJun 28, 2023Jul 11, 2023Nov 17, 2028Agitation30,000,000Atchafalaya Bar ChannelAtchafalaya Bar ChannelOpen WaterTransitional PlacementTask OrderW912P823R0052 23MVN058Sep 22, 2026
2023Norfolk Atlantic Ocean Channel Deepening ContractedCompletedNew WorkDec 2, 2022Feb 6, 2023Aug 31, 2026Hopper2,442,429ATLANTIC OCEAN CHANNEL, Atlantic Channel Borrow AreaCraney Island North Cell, Dam Neck Ocean Disposal SiteUpland, Open WaterContractedW9123623B5000 https://sam.gov/opp/78ba7db89403412b822041afc9549e05/view23NAO006Sep 20, 2026
2023Seattle FY23-26 Grays Harbor Dredging ContractedCompletedMaintenanceFeb 15, 2026Mechanical3,050,617Inner Grays Harbor Grays Harbor Placement Area, SOUTH JETTY PLACEMENT SITES Open Water, Open WaterDisposalContracted23NWS001Sep 20, 2026
2024Alaska FY24-26 Nome Harbor Maintenance Dredging ContractedCompletedOct 31, 2023Nov 30, 2023Cutter SuctionEast Sediment Trap, Harbor Approach & Inner Harbor, Inner Entrance Channel, Outer Entrance ChannelEast Dredge Material Placement AreaBeach/ShorelineBeach/Shoreline NourishmentContractedW911KB24B0002 https://sam.gov/opp/54c4e575e73d426581615b846f23a442/view24POA004Sep 15, 2026
2024Alaska FY24-FY26 Anchorage Harbor Maintenance Dredging ContractedActiveOct 6, 2023Nov 13, 2023Oct 31, 2024Hopper1,100,000Anchorage Harbor - Dock, Anchorage HarborPort of Anchorage In-Water Disposal Site, Anchorage Harbor Placement SiteOpen Water, Open WaterDisposalContractedW911KB24R0002 24POA001Sep 20, 2026
2024Alaska FY24 St. Paul Harbor Repairs & Maintenance Dredging ContractedCompletedMaintenanceJun 17, 2024Aug 8, 2024Sediment Management Area, Inner Maneuvering Basin, Outer Maneuvering Basin, Inner Entrance Channel, Outer Entrance ChannelKaminista Public Works Lot, City LandfillConfined (Diked) Placement Area, Confined (Diked) Placement AreaDisposalContractedW911KB24B0003 https://sam.gov/opp/6711d38f5ae4449b9ed1371145ace7ec/view24POA007Sep 15, 2026
2024Baltimore Mid-Chesapeake Bay Ecosystem Restoration - Barren Island Restoration, Phase 2 ContractedCompletedMaintenance, OtherMay 3, 2024Jun 26, 2024Mar 31, 2027Cutter Suction, Pipeline200,000Honga River Channel, North East Sill, Southern Borrow Area B, Southern Borrow Area ANE Sill, Barren Island (Mid-Bay Project), Bird Island A, Bird Island M, Barren Island SW Containment AreaIsland, Island, Island, Island, IslandIsland HabitatsContractedW912DR24B0002 24NAB005Sep 20, 2026
2024Charleston FY24 AIWW Beneficial Use Sediment Rehandling at Breach Inlet, AIWW ContractedCompletedMiningNov 15, 2023Jan 31, 2024Nov 30, 2025Cutter Suction, Pipeline789,302PA 1088S W-C, PA 1110S W-C, PA 1028S W-C, PA 1056S W-CIsle of Palms, Sullivans IslandBeach/Shoreline, Beach/ShorelineContractedW912HP24B0002 https://sam.gov/opp/b83339cd467c4d649d07ad252272257b/view24SAC007Sep 20, 2026
2024Charleston FY24 Myrtle Beach Emergency Renourishment ContractedCompletedMaintenance, MiningJul 18, 2024Aug 21, 2024Dec 2, 2025Aug 31, 2026Hopper2,000,000Cane South Beach Borrow Area, Little River Borrow A-4, Little River Borrow B-3, Little River Borrow B-2, Little River Borrow A-2, Little River Borrow C-1, Little River Borrow A-3, Little River Borrow B-1, Little River Borrow A-1, Surfside_Beach_Borrow - Borrow Area used for Beach Protection Projects, 1, 2Surfside & Garden City, North Myrtle Beach, Myrtle Beach, Reach 1Beach/Shoreline, Beach/Shoreline, Beach/Shoreline, Beach/ShorelineContractedW912HP24B0005 https://sam.gov/workspace/contract/opp/9d378fc5f2cb4edbbee1599e8fedc171/view24SAC005Sep 20, 2026
2024Detroit FY24 Alpena Harbor Maintenance Dredging ContractedCompletedMaintenanceJan 13, 2026Feb 17, 2026Alpena HarborAmrize Plant Upland SiteConfined (Diked) Placement AreaDefinitive ContractW911XK26BA009 https://sam.gov/workspace/contract/opp/48c85e65e6f2402da8fb5cf8452274dd/view24LRE001Sep 15, 2026
2024Detroit FY24 Keweenaw Waterway & Presque Isle Maintenance Dredging ContractedCompletedMaintenanceAug 9, 2024Aug 27, 2024Presque Isle Harbor, Keweenaw ChannelPresque Open Water, Keweenaw CDFOpen Water, Confined (Diked) Placement AreaContractedW911XK24R0053 24LRE005Sep 15, 2026
2024Detroit FY24 Little Lake Harbor ContractedCompletedMaintenanceOct 6, 2025Pipeline37,600Little Lake HarborNearshoreBeach/ShorelineContracted24LRE021Sep 15, 2026
2024Detroit FY24 Manistique Harbor ContractedCompletedMaintenanceAug 29, 2025Pipeline92,500Manistique HarborNearshoreBeach/ShorelineDefinitive Contract24LRE022Sep 15, 2026
2024Galveston Brazos Island Harbor Channel Improvement Project - Phase II ContractedCompletedMaintenance, New WorkCutter Suction7,012,000Brownsville Ship ChannelPA 7, PA 5BConfined (Diked) Placement Area, Confined (Diked) Placement AreaDisposalContractedW912HY24B0016 24SWG022Sep 15, 2026
2024Galveston FY24 Corpus Christi Ship Channel Maintenance Dredging - Inner Basin to Viola ContractedCompletedMaintenance, May 31, 2024Jul 17, 2024Oct 9, 2025Cutter Suction4,403,000Rincon Channel, Corpus Christi Channel, Section 15: 287+51.47 to 309+57.41, La Quinta ChannelBU Site I, IH 2, PA 6, PA 16/17, PA 13, PA 14/15Island, Confined (Diked) Placement Area, Confined (Diked) Placement Area, Open Water, Confined (Diked) Placement Area, Open WaterDisposal, Island Habitats, Transitional PlacementContractedW912HY24B0001 https://sam.gov/opp/e90e3c54fe43423898100d0cf4392791/view24SWG014Sep 20, 2026
2024Galveston FY24 Houston Ship Channel Maintenance Dredging - Bayport to Morgans Point & Bayport Ship Channel ContractedCompletedMaintenanceApr 30, 2024Aug 10, 2024Jun 30, 2025Hopper3,474,000Bayport Ship Channel, HSC Bayport to Morgans Point, Bayport FlarePA 1 Zone C, PA 1 Zone EOpen Water, Open WaterDisposalContractedW912HY24B0007 https://sam.gov/opp/6e8bd9c2f66c47cf8fdd343c234eac7b/view24SWG003Sep 20, 2026
2024Galveston Houston Ship Channel Deepening (Package 7) - Barbours Cut Channel ContractedCompletedNew WorkNov 20, 2023Jan 26, 2024Jan 17, 2028Cutter Suction, Pipeline2,800,000Cedar Bayou Access Channel, M12 Access Channel, Barbours Cut - South Widening, Barbours Cut Channel - North WideningM12, Atkinson Is. MarshConfined (Diked) Placement Area, UplandContractedW912HY24R0008 24SWG005Sep 20, 2026
2024Galveston Sabine-Neches Waterway Channel Improvement Project - Contract 6 ContractedActiveMaintenance, New WorkJul 29, 2024Sep 4, 2024Apr 30, 2027Hopper, Mechanical, Pipeline35,874,000Sabine Pass ChannelPA B, PA D, PA C, PA 2, PA 3, PA 4, PA D, PA 1, PA AOpen Water, Open Water, Open Water, Open Water, Open Water, Open Water, Open Water, Open Water, Open WaterDisposalContractedW912HY24B0021 24SWG012Sep 20, 2026
2024Honolulu FY24 Haleiwa Small Boat Harbor , Oahu ContractedProposedMaintenanceFeb 17, 2027Sep 27, 2027Mechanical10,000Haleiwa HarborSouth Oahu ODMDSOpen Water24POH001Sep 20, 2026
2024Jacksonville FY24 AIWW & Ponde de Leon Inlet Maintenance Dredging ContractedCompletedMaintenanceMay 30, 2024Sep 5, 2024Oct 27, 2025Cutter Suction913,400Atlantic Intracoastal Waterway, Ponce de Leon Inlet & ChannelsPonce Inlet North BeachBeach/ShorelineBeach/Shoreline NourishmentContractedW912EP24B0013 https://sam.gov/opp/de5d369cb6474b588498b0df06d0317d/view24SAJ010Sep 20, 2026
2024Jacksonville FY24 Tampa Harbor Maintenance Dredging ContractedCompletedMaintenanceJul 15, 2024Sep 12, 2024Sep 11, 2025Clamshell, Hopper, Mechanical, Pipeline335,000Cut-C (HB)Alafia Banks Placement Area, DMPF-2DBeach/Shoreline, Beach/Shoreline Nourishment, Upland HabitatsContractedW912EP24B0010 https://sam.gov/opp/23c2a3f7024c40b98eccdac9f31f40ba/view24SAJ008Sep 20, 2026
2024Los Angeles FY23-25 Santa Barbara Harbor Maintenance Dredging ContractedCompletedDec 22, 2022Apr 30, 2024Cutter Suction240,000Santa Barbara HarborEast BeachBeach/ShorelineBeach/Shoreline NourishmentContractedW912PL23B0001 https://sam.gov/opp/444a9bcf968d43e5b422e691360353c2/view24SPL002Sep 20, 2026
2024Mobile FY24 W9127825fa014 - Bwt Small Boat Access (24in Rental) ContractedCompletedApr 16, 2025Pipeline24SAM414Sep 15, 2026
2024Mobile Mobile Harbor, Deepening and Widening – Phase 6 ContractedCompletedNew WorkCutter SuctionMobile River Channel, Mobile Upper Bay Turning Basin, Mobile Upper Bay Channel Phase 6 WideningDauphin Island Causeway South, Mobile ODMDS, Area B, Dauphin Island Causeway North, Deer River Placement Area, Area ABeach/Shoreline, Open Water, Open Water, Beach/Shoreline, Beach/Shoreline, Open WaterAquatic Habitats, Beach/Shoreline Nourishment, DisposalContractedW9127824B0001 https://sam.gov/opp/fe9fa6ec7a5a4b8b800ddf2d69f7aad9/view24SAM013Sep 15, 2026
2024Mobile Mobile Harbor Deepening - Phase 2A ContractedCompletedMaintenance, New WorkJun 12, 2024Jul 17, 2024Mar 19, 2025Clamshell, Cutter Suction, HopperMobile Bar ChannelMobile ODMDS, SIBUAOpen Water, Open WaterBeach/Shoreline Nourishment, DisposalContractedW9127824B0007 https://sam.gov/opp/a77e5be07d9e4ed5af4a4ab7e8007760/view24SAM014Sep 20, 2026
2024New Orleans FY24 Bayous Chene, Boeuf & Black Maintenance Dredging ContractedCompletedMaintenanceAug 12, 2024Sep 18, 2024Apr 29, 2026Cutter Suction2,483,830Bayou Chene, Bayou Boeuf, Bayou BlackBayou Chene DA 2, Bayou Chene DA 6, Penchant East, Penchant West, DA 3A, DA 3B, Lake Gascha, Bayou Chene DA 6, Bayou Black DA 3, Bayou Black DA 1, Bayou Black DA 2Wetland/Marsh, Wetland/Marsh, Wetland/Marsh, Wetland/Marsh, Wetland/Marsh, Wetland/Marsh, Wetland/Marsh, Wetland/Marsh, , , Upland Habitats, Wetland HabitatsContractedW912P824B0053 https://sam.gov/opp/d5fa1866446f4cd89a82da7d56eb9991/view24MVN013Sep 20, 2026
2024New Orleans FY24 Gulf Coast Regional Hopper Dredge ContractedCompletedJul 1, 2024Aug 15, 2024Nov 18, 2025HopperBAR SHEET 28 - -1.1 TO -2.5ODMDS #1 - Calcasieu River ODMDS #1Open WaterContractedW912P824B0036 https://sam.gov/opp/193445d6155840a181da5f2fa1e245a4/view24MVN005Sep 20, 2026
2024New Orleans FY24 Gulf Coast Regional Hopper Dredge - New Orleans District ContractedCompletedMaintenanceJul 1, 2024Aug 15, 2024Nov 18, 2025Hopper4,324,520Belmont Crossing, Calcasieu Bar Channel, Southwest PassHDDA, Belmont Crossing Open Water, Calcasieu Bar Agitation, Calcasieu Bar ODMDS, SW Pass ODMDSOpen Water, Open Water, Open Water, Open Water, Open WaterDisposal, Transitional PlacementContractedW912P824B0036 https://sam.gov/opp/193445d6155840a181da5f2fa1e245a4/view24MVN005Sep 20, 2026
2024New Orleans FY24 Southwest Pass Hopper Dredging - Contract 1 ContractedPausedMaintenanceMar 5, 2024Jul 11, 2024Aug 2, 2026Hopper2,477,015SOUTHWEST PASS, Southwest PassHDDA, Southwest Pass Agitation, Southwest Pass ODMDSOpen Water, Open Water, Open WaterDisposal, Transitional PlacementDefinitive ContractW912P824B0011 https://sam.gov/opp/3cf0cb1bb96b4f309d57c0d1bc80d719/view24MVN004Sep 20, 2026
2024Norfolk Norfolk Harbor Atlantic Ocean Channel Deepening - Phase II ContractedCompletedNew WorkAug 29, 2023Oct 16, 2023Aug 31, 2026Hopper5,660,000Atlantic Ocean ChannelCraney Island, Croatan Beach, Dam Neck Ocean Disposal Site, Resort BeachUpland, Beach/Shoreline, Open Water, Beach/ShorelineBeach/Shoreline Nourishment, DisposalContractedW9123623B5006 https://sam.gov/opp/a1c7a9fb53fc4d00b60d7bb9084e4521/view24NAO016Sep 20, 2026
2024Savannah FY26 Brunswick Entrance Channel Widener Maintenance Dredging ContractedActiveJun 24, 2024Dec 19, 2025Aug 31, 2026Clamshell, Hopper2,150,000Brunswick Entrance ChannelBrunswick ODMDSOpen WaterDefinitive ContractW912HN24B5005, W912HN25BA021 https://sam.gov/opp/e2f6f3d82b5a4e86b5260622a112e295/view24SAS004Sep 20, 2026
2024St. Paul FY24 Lower Pool 10 Hrep (Stage 1) ContractedActiveMaintenanceSep 12, 2024Nov 25, 2027Mechanical100,000McMillan Island Dredge CutsLower Pool 10 HREP Islands Stage 1Island24MVP001Sep 20, 2026
2024St. Paul FY24 Mechanical Dredge Idiq Base + 4 Ops Years ContractedActiveMaintenanceMay 13, 2024Nov 30, 2028Mechanical494,007Beef Slough - DN24-20, Boulanger Bend - DN24-05, Coulters Island - DN24-18, Freeborn Light - DN24-11, Grand Encampment 2 - DN24-10, Head of Richmond Island - DN24-24, Island 126 - DN24-34, Lansing Upper Light - DN24-31, Lower Approach to L/D6 2 - DN24-27, Lower Dresbach - DN24-29, Petersons Bar - DN24-26, Pine Bend - DN24-07, Reads Landing 2 - DN24-16, St. Paul Barge Terminal - DN24-322-821.1-LMT - Lower Boulanger - DN24-05, 2-823.8-LMT - Pine Bend - DN24-11, 3-799.2-RMT - Corps Island - DN24-18, 4-754.0-LWP - Alma Marina - DN24-04, 4-757.5-LWT - Teepeeota Point - DN24-10, 4-762.7-LWT - Reads Landing - DN24-06, 7-706.5-RMT - Dakota Island - DN24-29, 7-714.1-LWP - Trempealeau - DN24-22, MN-14.1-RMP - Cargill East - DN24-26Open Water, Open Water, Open Water, Upland, Open Water, Open Water, Open Water, Upland, UplandContracted24MVP002Sep 20, 2026
2025Alaska FY25 Anchorage Harbor 2024-2026 ContractedCompletedMaintenanceOct 6, 2023Nov 13, 2023Apr 1, 2025Oct 31, 2025Hopper, Mechanical1,100,000Anchorage HarborAnchorage Harbor Placement SiteOpen WaterContractedW911KB24R0002 25POA001Sep 20, 2026
2025Alaska FY25 Port Of Nome Expansion Phase Ia ContractedActiveNew WorkJul 28, 2025Oct 31, 2029Misc28,400Phase IA ExpansionPhase IA Upland Placement SiteUpland25POA402Sep 20, 2026
2025Baltimore FY25 Atlantic Coast Of Maryland ContractedProposedMaintenanceOct 9, 2026Feb 8, 2027Hopper1,000,000Atlantic Coast of MarylandOcean City BeachBeach/Shoreline25NAB003Sep 20, 2026
2025Baltimore FY25 Cape Henry Channel Maintenance Dredging ContractedCompletedMaintenanceJun 27, 2025Jul 30, 2025Apr 14, 2026Hopper1,500,000Cape Henry ChannelDam Neck Management Area (DNODS) - Cell 1Open WaterContractedW912DR25BA003 https://sam.gov/opp/1aea236d6ccc4e26b98b4de75f017eaf/view25NAB004Sep 20, 2026