














































Resources
Everything the Program Publishes, in One Place
The specifications, memoranda, guidance, research and training material that support Dredging Quality Management, gathered from across this site. Each item is served from this domain and always resolves to the current version — a link you save today keeps working when the document is next revised.
-
September 18, 2026
Download (238 KB)Hopper Dredge Plant Instrumentation Plan Punch-List
-
September 18, 2026
Download (232 KB)Mechanical Dredge Plant Instrumentation Plan Punch-List
-
September 18, 2026
Download (239 KB)Pipeline Dredge Plant Instrumentation Plan Punch-List
-
September 18, 2026
Download (334 KB)Scow Dredge Plant Instrumentation Plan Punch-List
-
February 19, 2025
Download (161 KB)Who does what, and when, on dredging under a Department of the Army permit — from the pre-application meeting and permit evaluation through project setup, certification verification and dredging. Each step is split between the district point of contact, the DQM Center and the permittee.
-
February 6, 2024
Download (2.8 MB)The form that tells the DQM Center a new project is coming: district, contract or permit number, contractor, the plants expected to work, and the dredging and placement areas. Submit it before work starts.
HopperString
XMLDownload (2 KB)Example hopper dredge data-transmission string.
MechanicalString
JSONDownload (376 B)Example mechanical dredge data-transmission string.
PipelineString
JSONDownload (337 B)Example pipeline dredge data-transmission string.
ScowString
XMLDownload (871 B)Example scow data-transmission string.